Customization: | Available |
---|---|
Customized: | Non-Customized |
Standard: | DIN |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product: |
Multi Functional Home Decoration Ceramic Tile Glass Eccentric Thread Drill Bit |
Brand: |
Green Arrow |
Size: |
4mm-12mm |
Raw Material: |
Alloy Steel , Tungsten Carbide |
Application |
Metal,Ceramic,Wood,Brick wall,Glass,Concrete |
Packing: |
Plastic Box |
Brief Introduction
Exhibition
Workshop & Testing Lab
Packing & Shipping
Packing:Inner package: Robust PVC Box ensures safe containment of the product; Outer package: Sturdy Cartons provide secure protection during transportation.
Shipping: Enjoy the convenience of diverse shipping solutions, including air or sea options (FOB ports: Shanghai/Ningbo), or opt for express services through DHL, UPS, TNT, FEDEX to meet your needs.
FAQ
1. Q: Is OEM available?
A: Absolutely, we offer comprehensive OEM services and customization solutions to perfectly align our products with your specific requirements.Moreover, we provide an extensive array of label printing services to cater to your branding needs.
2. Q:Are samples available?
A: Indeed, we are pleased to offer samples for your thorough evaluation once our competitive prices are confirmed. Please be aware that a freight fee is necessary upfront,
but rest assured, this fee will be fully reimbursed upon the placement of an official order.
3. Q: What are your payment terms?
A: We accommodate a range of payment preferences, accepting T/T, L/C, and PayPal, providing flexibility for varied financial scenarios.
4. Q: What delivery options do you offer?
A:Select from express delivery, air shipment, or sea shipping to best match your convenience and logistical needs.
5. Q: What is your delivery time?
A:Our standard delivery window is between 20-30 days following the receipt of your advance payment.
For products requiring custom specifications, the delivery period is extended to a timeframe of35-45 days after receiving the advance payment, ensuring precision and quality in each order.